AV is judged in a room, in front of the client, on the day. Graftix keeps the room schedule, the rack build, the first fix requirements and the commissioning record together so that walkthrough goes the way it should.

The problem

AV depends on trades that finished before you arrived

Every room needs power in the right place, a network drop that works, containment that was installed months ago, and a wall that can carry the weight. AV is where every other trade's shortcuts become your problem.

01

First fix was wrong and nobody said

Back boxes at the wrong height, no data drop behind the display, power on the wrong wall. Found on the day the kit turns up, weeks after the trade that did it left site.

02

Room schedules multiply

Forty rooms, six configurations, three revisions. Which room is getting which build is held in a spreadsheet that stopped matching the drawings at revision B.

03

Commissioning is invisible until it fails

Rack built, kit configured, room tested. None of it recorded anywhere the client can see, so the only evidence is whether it works while they are standing there.

Room by room

The room is the unit of work

Pin each room to the drawing and hold the configuration, display size, mount type, rack reference and control system as custom fields. Six standard builds across forty rooms becomes something you can filter and count rather than cross-reference by hand.

  • Room type and configuration held as custom fields on the pin
  • Clone a standard room build across every room that uses it
  • Filter to one build type to see exactly what is outstanding
  • Photos and markups attached to the room they belong to
See plans and tasks
Graftix AV layout for the Kestrel House first-floor meeting rooms filtered by device type: display screens and touch panels highlighted in each room, the rest of the AV build dimmed
Graftix AV task for the Kestrel House boardroom: blocked by the flooring contractor's screed, and set to start after small power second fix, data re-termination and the DB-L2 sub-mains, with the booking panels following it

Coordination

Catch first fix before it is buried

Because the electrical and data work sits on the same drawing set in the same platform, the AV requirement can be raised against the room before the plasterboard goes on rather than after it.

  • Dependencies linking AV work to the first fix it relies on
  • Blockers logged with an owner and a release date, not a phone call
  • RFIs raised against the exact room and position in question
  • Site instructions and variations logged when the spec changes late
See communication tools

What you will be asked for

Evidence the room was actually finished

AV rarely has a single governing certificate the way fire or electrical does, which makes a clear, self-assembled record more valuable rather than less.

Room schedules

Every room with its build configuration, equipment list and current status, tied to the drawing.

Rack elevations and builds

Held against the task for that rack, with photos of the finished build as evidence.

Commissioning sheets

Built as eForms in your own wording, one per room, completed and signed on site.

Client sign-off

A client approval task type on every room, so acceptance is recorded rather than remembered.

Technical submittals

Display, DSP, codec and control data sheets held once and reused across every job.

Asset register

Serials and warranty dates per room, which is exactly what the support contract needs.

Certification

Commissioning records per room and per rack, held with the handover pack behind them.

Maintenance contracts

Rooms and racks become a serviceable estate, with planned visits and a QR label on the rack door.

AV

Walk the client round with confidence.

Seven days, every feature, no card. Put a floor of rooms in it and see what happens when first fix problems surface early.