Fire alarm and detection

Every device you install ends up on a certificate with your name on it. Graftix holds the device schedule, the zone plan, the cause and effect and the commissioning record against the drawing they belong to.

The problem

Fire work is a paperwork job with some cable pulling attached

The install is the easy part. What decides whether the job goes smoothly is whether you can produce the right document, for the right device, on the day someone asks.

01

The schedule and the drawing disagree

The device schedule lives in a spreadsheet. The drawing lives in a PDF. Somebody moved a detector on site and told nobody, so the as-built is wrong before the job even finishes.

02

Cause and effect is a nightmare to evidence

Proving what triggers what, across dozens of zones and interfaces, in a form the responsible person and the approving authority will both accept.

03

Commissioning gets done, then lost

Test results written on a printed schedule, photographed badly, and never reconciled against the device list. Six months later nobody can prove a device was ever tested.

On the drawing

Every device where it actually is

Pin each detector, sounder, call point, interface and beacon to its real coordinate on the sheet. Address, loop, zone and device type live on the pin as custom fields, searchable across the whole project.

  • Loop and address held as custom fields on every device
  • Filter the drawing to one zone, one loop or one floor
  • Move a device on site and the record moves with it
  • AI symbol takeoff counts detectors straight off the drawing set
See plans and tasks

Shot F1

Fire device pins on a floor plan, filtered by loop

1600 × 1000

Shot F2

Fire commissioning certificate, rendered PDF output

1600 × 1000

Off the drawing

Records that hold up

Task types run the whole lifecycle: installation, inspection, commissioning, testing, certification and client approval. A device is not finished because someone fitted it, it is finished when it has been tested and signed off.

  • Certificates held against the project and exportable as clean PDFs
  • Custom eForms for your own commissioning and test sheets
  • Photo evidence attached to the device it relates to, not a camera roll
  • Full task history showing who did what and when
See compliance tools

What you will be asked for

The handover pack, assembled as you go

Nothing on this list gets created at the end of the job. It accumulates while the work happens, because it was captured at the point the work was done.

Device schedule

Every device with type, loop, address, zone and location, exportable and matched to the drawing.

Zone plan reference

Drawings held against the project with annotations, so the issued zone plan and the record agree.

Commissioning records

Built as eForms in your own wording, completed on site, filed against the project automatically.

Certificates

Fire and compliance certificates stored on the job and available long after the site closes.

RAMS

Issued, read and signed digitally, with version control so nobody is working to a superseded method statement.

Asset register

What was installed, where, with serials and warranty dates. The basis of the maintenance contract that follows.